Home / Services / BOM sourcing & kitting

BOM sourcing en kitting service

Upload the whole bill of materials. Every line is checked against the manufacturer part number, then quoted, flagged with a question or matched with candidate alternatives, in one reply within 24 hours.

Full kit or selected lines

Turnkey BOM kitting

We source every purchasable line, consolidate the material and ship one kit labelled by line number and reference designator. Suited to EMS turnkey builds and NPI runs where one missing part stops the line.

Partial BOM sourcing

Send the lines your usual distributors cannot cover: shortages, long lead times or minimum quantities that do not fit. We quote only those lines and leave the rest of your supply chain as it is.

How a BOM is processed

1. Upload

Excel, CSV or pasted lines. Keep your own column names; we map them.

2. Line review

Each MPN is checked for suffix, packaging, lifecycle status and DNP marks.

3. Questions back

Ambiguous lines come back as questions, not guesses.

4. Line-by-line quote

Price, packaging, date code, source status and lead time on every line.

5. Receive and inspect

Material is recorded on receipt and inspected to the agreed level.

6. Kit and ship

One labelled kit or split deliveries, with a packing list by BOM line.

What the BOM should include

Three columns are enough to start. The others decide whether the first quote is final or needs a second round.

Column
Verplicht
Waarom dit belangrijk is

Manufacturer part number (full, with suffix)

Ja

The suffix carries package, temperature grade and packing. A family name cannot be quoted.

Fabrikant

Ja

Separates parts that share a number across manufacturers.

Aantal per bouw en bouwhoeveelheid

Ja

We quote the total, plus any attrition you specify for SMT.

Referentieaanduidingen

Recommended

Used to label the kit and to check DNP lines.

Approved alternatives (AML)

Recommended

Lets us quote an approved second source without asking again.

Packaging and date code limits

If applicable

Reel-only lines, MSL handling or a maximum date-code age.

Target date and target price

Optional

Helps us choose between sources with different lead times.

Gebruik het BOM-sjabloon if you are building the list from scratch. Your own format is also accepted.

Every line comes back with a status

No silent substitutions

A BOM quote is only useful if the parts that arrive are the parts you approved. We never replace a line without written approval, and we keep DNP lines out of the quote unless you ask for them.

What changes the BOM price

Quantity and MPQ

Full reels are cheaper per piece; cut tape covers small builds.

Datumcode venster

A tight window narrows the sources that qualify.

Inspection level

Laboratory tests are quoted as separate lines before you order.

Delivery split

One kit or staged deliveries, each with its own freight line.

BOM sourcing questions

There is no line limit. Long BOMs are answered within 24 hours with the first status for every line; complex lines may need a follow-up round.

Yes. Unavailable lines are marked “Not available” with a reason, so you can decide whether to proceed with a partial kit.

Yes. Give the consignee and the delivery terms; the packing list is organized by BOM line so the EMS can receive against it.

Prototype BOMs are accepted. Any minimum that applies comes from the source of a specific line and is stated on that line.

Yes. The BOM is used only to source your enquiry. Supplier enquiries carry part numbers and quantities, not your file or your product details.